Video

MaMaJo cutterhead lowered into tunnel site

The cutter head of the more than 400-foot long machine was lowered nearly 200 feet down Monday, Feb. 4, 2019. The machine will drill a 5-mile tunnel designed to protect rivers from sewer overflow and neighborhoods from flooding.


Don't Miss

Latest News - Local